KrampeHarex Lösungspfeil

Schürzeberg
Tunnel

Fluchtstollen Schürzebergtunnel
Oberrieden (Germany)

Building:
Escape tunnel, final construction
Building component:
Tunnel inner shell made of sprayed concrete
Concrete:
C 30/37
Fibre type:
KrampeHarex DE 30/0,8 N
Fibre content:
30 kg/m³
Total volume:
Length 240 m, wall thickness 20 cm
Building company:
Baresel
Specifics: As the result of new EU safety regulations, a person escape tunnel was added to the Schürzeberg Tunnel Oberrieden in 2012. Steel fibre spray concrete in wet spray process. The steel fibres were seamlessly integrated at the TB factory using a conveyor belt, thus achieving a homogeneous distribution of the steel fibres in the concrete.

Schürzeberg Tunnel, Oberrieden (Deutschland)
Schürzeberg Tunnel, Oberrieden (Deutschland)
Schürzeberg Tunnel, Oberrieden (Deutschland)
Schürzeberg Tunnel, Oberrieden (Deutschland)
Schürzeberg Tunnel, Oberrieden (Deutschland)
Schürzeberg Tunnel, Oberrieden (Deutschland)
Schürzeberg Tunnel, Oberrieden (Deutschland)
Schürzeberg Tunnel, Oberrieden (Deutschland)
Schürzeberg Tunnel, Oberrieden (Deutschland)
Schürzeberg Tunnel, Oberrieden (Deutschland)

Pferdekamp 6-8 | 59075 Hamm | Germany
T +49 (0) 23 81.977977 | F +49 (0) 23 81.977955 info@krampeharex.com Office hours
Mon-Thurs. 7:00 a.m. – 5:00 p.m.
Fri. 7:00 a.m. – 2:00 p.m. 
Shipping times
Mon-Fri 6:00 a.m. – 2:00 p.m.