Tunnel Chain S35 Bruck
Mixnitz (Austria)
Building:
Tunnel
Building time:
2004 – 2009
Fibre type:
Spray concrete DE 30/060 N, portal report DE 50/080 M, inner shell PM 3/15
Building company:
ÖSTU Stettin Leoben
Tunnelchain:
Kaltenbach 1.165 m, Pernegg 2.800 m, Mixnitz 680 m
Cement provider:
Trans Mobil Bruck/M
Requirements:
Spray concrete E 2, portal report T 4 / TG 3, inner shell BBG