KrampeHarex Lösungspfeil

Southern Beltway
Underpass

Southern Beltway Underpass
Graz (Austria)

Building component:
Underpass
Building time:
2014 - 2017
Concrete:
C25/30/BS 1 A/FaB BBG, 22 degrees based on pump
Fibre type:
Fibrin 3/15 (PM 3/15)
Fibre content:
1,2 kg/m3
Total volume:
72,000 m3 fibre concrete
Building company:
Arge Porr/Granit
Specifics: Length: 1.4 km
The southern beltway underpass is 1.4 km long and, starting in 2017, will connect Graz with the city districts of Puntigam and Liebenau. Walls and ceiling made with BBG 1.2 kg fibrin 3/15 (PM 3/15). 

Südgürtel Unterführung, Graz (Österreich)
Südgürtel Unterführung, Graz (Österreich)
Südgürtel Unterführung, Graz (Österreich)

Pferdekamp 6-8 | 59075 Hamm | Germany
T +49 (0) 23 81.977977 | F +49 (0) 23 81.977955 info@krampeharex.com Office hours
Mon-Thurs. 7:00 a.m. – 5:00 p.m.
Fri. 7:00 a.m. – 2:00 p.m. 
Shipping times
Mon-Fri 6:00 a.m. – 2:00 p.m.