Project information
Project: | Bridge structure S35 |
Location: | Bruck an der Mur, Austria |
Application: | Traffic areas |
Attribute: | Protective concrete |
Construction time: | June - July 2008 |
Concrete: | Transbeton ready-made concrete, Bruck/Mur, C 25/30/B3/GK 8/F 52 |
Fibre type: | DE 50/1.0 N |
Total volume: | 960 m³ |
Dosage: | 20 kg/m³ |
Joint division: | 6.00 m x 6.00 m |