Project information
| Project: | Excape gallery Schürzebergtunnel |
| Location: | Oberrieden, Germany |
| Application: | Tunnel construction |
| Component: | Passenger escape gallery |
| Art: | Shotcrete |
| Construction time: | 2012 |
| Requirement: | Determind by standards and guidelines |
| Concrete: | C 30/37 |
| Fibre type: | DE 30/0.8 N |
| Dosage: | 30 kg/m³ |
| Length: | 240m |
In the course of new EU safety regulations, the Schürzebergtunnel was extended in 2012 to include a passenger escape gallery. The steel fibre shotcrete was used in a length of 240 m with a wall thickness of 20 cm as a permanent extension