Project information
Project: | Excape gallery Schürzebergtunnel |
Location: | Oberrieden, Germany |
Application: | Tunnel construction |
Component: | Passenger escape gallery |
Art: | Shotcrete |
Construction time: | 2012 |
Requirement: | Determind by standards and guidelines |
Concrete: | C 30/37 |
Fibre type: | DE 30/0.8 N |
Dosage: | 30 kg/m³ |
Length: | 240m |
Special feature
of the project
In the course of new EU safety regulations, the Schürzebergtunnel was extended in 2012 to include a passenger escape gallery. The steel fibre shotcrete was used in a length of 240 m with a wall thickness of 20 cm as a permanent extension
Pictures of the project
Do you have questions
about the project?
We look forward to hearing from you.
Christian Braun
Projectmanagement Tunnel construction & Mining