A new railway system for Denmarks capital

Cityringen Metro

Cityringen Metro is the largest construction project in Copenhagen since the construction of Christianshavn in the middle of the 17th century.

Cityringen is a completely new subway section located in the center of the Danish metropolis. The construction project consists of 17 new underground stations and a 30 km long tunnel. Both the tunnel and the stations are located below groundwater level, which significantly increases the demands on the concrete.

The total tunnel length, which was dug using 4 tunnel boring machines, will be approx. 30 km. To line the tunnel tube, 125,000 prefabricated tubbing segments are being used, in which steel fibres from KrampeHarex have been processed.

Wilhelm Nell on

Polypropylene fibres for fire protection in tunnels.

Beim Aufruf des Videos werden personenbezogene Daten (IP-Adresse) an den Betreiber des Videoportals gesendet. Daher ist es möglich, dass Zugriffe gespeichert und ausgewertet werden. Detaillierte Infos finden Sie in unserer Datenschutzerklärung.

Vorschau auf externe Inhalte

Further case studies

from the tunnel sector

Rogfast tunnel

Stavanger region | Norway

Read more

DTSS2 T-07 Inner Lining

Singapore

Read more

Escape gallery Schürzebergtunnel

Oberrieden | Germany

Read more

Tunnel chain S35

Mixnitz | Austria

Read more


Do you have questions
about the project?

We look forward to hearing from you.

9Ei4ghtBSDix
Ja, ich habe die Bedingungen gelesen und akzeptiere sie.