| Project: | Südgürtel |
| Location: | Graz, Austria |
| Application: | Tunnel construction |
| Attribute: | Subway |
| Construction time: | 2014-2017 |
| Concrete: | C25/30/BS 1 A/FaB BBG, 22 degrees based on pump |
| Tota volume: | 72,000 m³ steel fibre concrete |
| Dosage: | 1.2 kg/m³ |
| Fibre type: | Fibrin 3/15 (PM 3/15) |
| Building company: | Arge Porr/Granit |