Project information
Project: | Südgürtel |
Location: | Graz, Austria |
Application: | Tunnel construction |
Attribute: | Subway |
Construction time: | 2014-2017 |
Concrete: | C25/30/BS 1 A/FaB BBG, 22 degrees based on pump |
Tota volume: | 72,000 m³ steel fibre concrete |
Dosage: | 1.2 kg/m³ |
Fibre type: | Fibrin 3/15 (PM 3/15) |
Building company: | Arge Porr/Granit |
Do you have questions
about the project?
We look forward to hearing from you.
Christian Braun
Projectmanagement Tunnel construction & Mining