KrampeHarex GmbH & Co. KG
Pferdekamp 6-8
59075 Hamm
Germany

Contact
T
 +49 02381 977 977
F +49 02381 977 955
E info@krampeharex.com

Office hours

Mon - Thurs 7 a.m. - 5 p.m.
Fri 7 a.m. - 2 p.m.

Shipping times

Mon - Fri 6 a.m. - 2 p.m.

Project information


Up to 10,000 vehicles a day

A safe ride on UHPC

The well-known viaduct from the seventies is getting on in years. Most recently, the maximum vehicle weight even had to be reduced from 40 tons to 3.5 tons. The prestressed concrete box girder structure showed considerable water leaks, corrosion at the prestressing cables and the reinforcement as well as extensive concrete damage due to an alkali aggregate reaction.

In order to make the bridge passable for heavy traffic again, it was decided to rehabilitate the bridge with ultra-high performance fibre-reinforced concrete, removing the old road surface and the damaged structural concrete. All damaged areas on the box girders and the entire pavement were rehabilitated and reinforced with a 50 mm thick layer of UHPC. In addition to reinforcing the structure, the ultra-high strength steel fibre reinforced concrete also serves as a structural sealing. Thus, the busy bridge can be opened again for the very large trucks in the future. 

Bilder des Projekts

© UHPC solutions

Do you have questions
about the project?

We look forward to hearing from you.

hNLiYn9ee73
Ja, ich habe die Bedingungen gelesen und akzeptiere sie.