Project information
Project: | TB-System underwater concrete |
Location: | Hamburg, Germany |
Application: | Special constructions |
Component: | Foundation slab |
Construction time: | 2011 |
Requirement: | Performance class L 1.2/0.9 |
Concret: | C 25/30 |
Fibre type: | DE 50/1.0 N |
Dosage: | 40 kg/m³ |
Further information
to the project
The foundation was made on drilled piles at a depth of 3.00 m under water in the area of the Hamburg harbor. The static design by SCE resulted in a combination reinforcement with a performance class of L 1.2/0.9.
Do you have questions
about the project?
We look forward to hearing from you.
Frank Schuhmacher
Head of sales Fibres Germany