KrampeHarex GmbH & Co. KG
Pferdekamp 6-8
59075 Hamm
Germany

Contact
T
 +49 02381 977 977
F +49 02381 977 955
E info@krampeharex.com

Office hours

Mon - Thurs 7 a.m. - 5 p.m.
Fri 7 a.m. - 2 p.m.

Shipping times

Mon - Fri 6 a.m. - 2 p.m.

Project information


Special Feature

of the Projekt

The majority of the new tunnel was constructed using the closed cut-and-cover method using excavators or blasting. In addition, open cut construction was used for some sections. The use of polypropylene fibres ensures fire protection.



Fire protection in the tunnels

A burning issue

Preventive fire protection is becoming increasingly important in tunnel construction. New concepts call for the concrete itself to have a protective effect. This is made possible by adding plastic fibres. These reduce or prevent explosive concrete spalling.

The polypropylene fibres from KrampeHarex are the result of many years of research and development. Together with institutes such as societies for materials research, they have been tested for their fire protection properties and have already been used in numerous pilot projects.


Pictures of the project

Do you have questions
about the project?

We look forward to hearing from you.

8NRNKiwnkeZ
Ja, ich habe die Bedingungen gelesen und akzeptiere sie.